Case study published: Water-powered drilling inside Stockholm’s Central station
The Stockholm Central station has been sinking 1 mm per year and needed reinforcement of the foundation. This was done by drilling and setting casing all the way down to the bedrock.
Wassaras water-powered DTH hammer was prescribed for the project as the environment was sensitive in several ways.