Wassara is launching a new hammer range - Generation 3 (G3). First out is our W120.G3-hammer. It has now been used in a project in Södertälje, south of Stockholm, Sweden
The already existing canal lock chamber in Södertälje needed to expand and two new lock-gates also needed to be constructed. Ground conditions present were esker with highly variable conditions and layers of singular grain sizes and boulders.
The Wassara approach was the preferred method used due to the formation already mentioned, but also since the formation was water drenched and consisting of high permeability layers.
Wassaras new version of the W120 hammer (W120.G3) proved to be the right choice for the job!
Read the Case Study here