Ground engineering

Energy storage in Lund, Sweden

A project with strict restrictions regarding the water returned to the sewage system.

Location

Lund, Sweden

Contractor

Skånska Energi AB

Type of product

W120

Drilling for an energy storage in the city of Lund in the south of Sweden was performed by the contractor Skånska Energi AB. A total of 17 holes were first casing advanced to 90 meter and then drilled down to a total depth of 250 meter. Casing OD was 168 mm and hole diameter 140 mm. The hammer used was the W120.

Geology was a mix of shale, clay, sand and sandstone. When drilling in this geology the return water from the hole contains a large fraction of particles in the micron range which are very difficult to sediment out from the return water. Since there were strict restrictions on the solids content in the water returned to the sewage system (in the order of 40 mg/liter) a solution had to be found.

The solution was to rent a centrifuge from Noxon, see www.noxon.com, which reduced the solids content in the return water to a level acceptable to the environmental authorities.

The pump container – from the inside.

Equipment used

DTH HammerWassara W120
Casing advancing systemØ 168 mm
Drill bitØ 140 mm
Drilling fluidClean water
Water treatmentCentrifuge from Noxon