Here you can read how our water-powered technology has helped our customers in different projects, all around the world.
Mining
The combination of the water-powered Wassara-hammers and the water-powered drill rig, provided by the contractor HPE, achieved optimal drilling conditions.
Ground engineering
Wassara´s new hammer developed specifically for Ground Engineering was tested in a casing advancement application during dredging works for widening …
The San Geronimo mine in Chile was facing the challenge of creating open slots with a high productivity in a safe manner.
Surveying
With a successful launch of the LKAB Wassara Surveying Services during 2021, the operation has now expanded outside of Scandinavia.
A storage building has been constructed in Hässleholm, Sweden. The ground needed stabilization as the geology presented sand and friction …
UrbanGeo
By drilling with Wassaras water-powered DTH hammer instead, the water in the formation was not affected at all and the delay was heavily reduced.
Since 2021, LKAB Wassara has been performing surveying services globally, using our own gyro, the Wassara Explorer.
Tunneling
New York City needs a new water supply system, and the contractor for this big project decided to use the Wassara W50 hammer on their Robbin’s TBM-machine
The City Line railway project builds a six km long commuter train tunnel under the central parts of Stockholm, Sweden
Dams
The Wassara technology was used for drilling the foundation drainage and grouting holes and was chosen as it has delivered …
LKAB Wassara’s W120 water-powered hammer played a decisive role in the making of the tunnels going under the river Isarco, near Fortezza in Italy.
The rehabilitation of the Wolf Creek Dam in Kentucky, USA, started in 2007. Wassaras waterpowered drilling equipment was chosen for …
In the very heart of Stockholm, a building needed heating and cooling. This project required a method that provided a safe working environment, was environmentally friendly and could drill straight holes.
When complete, the Angostura Hydroelectric Plant will deliver power to around 300 000 households. The bedrock needed water-proofing, this was …
A project with strict restrictions regarding the water returned to the sewage system.
Thanks to Wassaras water-powered DTH hammer, drilling passed without incident through the different formation layers.
Today, all production drilling at LKAB is operated with the water-powered DTH hammer from Wassara